Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656203

- Product Categories
- Friendly Links
Information Name: | Mining hot air units, hot air unit, kjz mine heating unit |
Published: | 2015-05-06 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Mines heating unit installation operations basic specification: around mine heating unit installation position, especially HTM nozzle and side access doors must leave some space for installation, maintenance equipment hot air units, equipment should be placed in the room above the ground 150-200mm high on a base of cement or steel, power supply equipment for mine heating unit 380V, 50Hz electrical wiring should pay attention to see the fan impeller rotation direction is consistent with the provisions of the rotation flag, mine heating unit shall comply with the requirements of HTM steam. Heating unit when the mine opened gradually pressurized medium heat until far added to 0.3MPa, working pressure of the air heater was 0.3MPa. Procedures, mine heating unit installation, commissioning and trial operation of the plant should be completed formally put into production operation according to prescribed procedures using the operation. Preparation and examination before driving a. To remove residual debris within the unit, water and dirt. The relevant provisions of the heating unit used mine: mine heating unit should first check whether the clean air duct, HTM meets clean water softening or 0.2 ~ 0.4MPa steam requirements. Unit HTM system working pressure should not exceed 0.6MPa, check the fan impeller rotation direction is consistent with the provisions of signs, operations management unit run by professionals, should regularly check the health of a hot air unit, it was found to be abnormal in time or downtime excluded. Winter shutdown should ensure hot water vapor cycle, to prevent frozen heater unit access door must be opened to prevent the fan motor overheating, unit maintenance units often remove surface dust, clean, install and run the unit after a month, should be fully inspected once each After the kind of connections are tight hot air unit, Shanxi mine, mine heating unit unit run for two years, should conduct a comprehensive inspection, maintenance, maintenance. The focus should check the heat exchanger, the heat medium water pipeline system, when the unit is shut down in the summer will be filled with water heat exchanger, the inner tube to prevent corrosion; in winter the water heat exchanger inside the evacuation of all, to prevent cracking. Mining hot air units, hot air unit, kjz mine heating unit provided by the Texas Huaxin air-conditioning plant. Texas Watson conditioning plant (www.wchuaxin.com) (www.wchuaxin.com) in heat, refrigeration and air conditioning equipment in the fields devoted boundless enthusiasm and passion, Watson air conditioning has been customer-centric, for customers to create Idea value, quality, service to win market, and sincerely hope to cooperate with the community to create success, to create brilliant. Related businesses welcomed the inquiry, Contact: Su Jingli. |
Admin>>>
You are the 36842 visitor
Copyright © GuangDong ICP No. 10089450, Texas Watson air-conditioning plant All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 36842 visitor
Copyright © GuangDong ICP No. 10089450, Texas Watson air-conditioning plant All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility